Storage Requirements

Enter the number greater than 200 and less than 1000000
Enter the number greater than 0.2 and less than 1000

Years Enter the number greater than 3 and less than 7

Ready to Turn These Savings into a Reality?

TCO With Maximum Potential Savingsi These numbers reflect the comparison costs of Seagate offerings in dollars and percentages.

JBOD

corvault

Drivers For Overprovisioning

Maintenance Cost (labor)

Networking Cost (switches)

Server Cost (compute)

Ready to Turn These Savings into a Reality?

TCO Comparison Table

Cost Comparison

Cost Comparison
Competitive JBOD
System TCO, $
CORVAULT
System TCO, $
TCO
Difference, $
TCO
Difference, %
Server Cost - Compute
Server Cost (realizable savings)*
Server Cost (max potential savings)
Maintenance Cost
Drive replacement - labor cost
Drive replacement - new drives cost
Networking cost - switches
Networking cost (realizable savings)*
Networking cost (max potential savings)
Storage system cost
Purchasing cost - drives for overprovisioning
Total Costs (directly affected)
Total Costs (max potential savings)
  1. *Realizable savings are adjusted for the effect of differences in customer systems architecture that might limit savings potential.